__________Northerly Crossings

                                                    ___________Corridor Congestion

                                                                   ___________Mitigation Study


Home About Us Project Background Study Bridges Public Participation Project Schedule Conceptual Alternatives Informational Materials Photo Gallery Contact Us                                     


The Final Report is now available.













The Delaware River Joint Toll Bridge Commission (DRJTBC) is currently performing the Northerly Crossings Corridor Congestion Mitigation Study to identify existing transportation conditions, future needs and potential problems and to develop a range of conceptual alternatives to mitigate deficiencies.  The following DRJTBC bridges are the focus of the study:


Portland - Columbia Toll Bridge


Portland - Columbia Pedestrian Bridge


Delaware Water Gap (I-80) Toll Bridge


Milford - Montague Toll Bridge




This website will be utilized to communicate study information to the public.  Additionally, public meetings will be held throughout the course of this 18-month study.  Materials available on the website will be available in hard copy format at each of the three (3) DRJTBC toll facilities in the project area.


Back to Top


Project sponsored by the Delaware River Joint Toll Bridge Commission.
Site Design and Development by Michael Baker Jr. Inc.
Last updated: February 10, 2006.